health care risk waste and general waste incinerator

We strive for a sustainable development therefore we are adopting a sustainable medical waste management system, which includes building a modern sustainable incinerator that will not only cater for our facility but also for the other facilities in the larger area of the region. We are aware that we need a  modern incinerator that will not burden the local people or the local environment even more. There are several different types of incinerators available (especially recommended to be built with local materials), which are cheap to build but are more harmful to people and environment.slaughterhouse in Afghanistan in ministry of agriculture. Each plant has capacity of 100 cattle and 500 sheep per day.burn dead chicken of weight 50 kg.4.Waste  type :   health care risk waste and general waste
5. Chimney stack:
Chimney : 3.5mm mild steel
Height from base :11m and if there are buildings within
30m of the incinerator, chimney must extend at least 3m
above the apexes of all the roof of such buildings
Diameter of chimney at top :430mm
Weight of stack:  ±500 Kg
Case and stack be painted with 400⁰C heat resistant Black paint
6.Burners:
1st  chamber 850⁰C  – 900⁰C
2nd  chamber 1000⁰C
7.Variable speed combustion air blowers
8.Primary chamber volume  ±1.05 cubic metres
9.Mixing chamber volume  ±0.30 cubic metres
10.Settling chamber volume ±0.89 cubic metres
11.Weight excluding chimney  ±6.400Kg at manufacture
12..Firing tools supplied :Hoe ,poker and rake
13.Dimensions
Length                   ±2125mm
Width                    ±1890mm
Height                   ±2125mm
Extra width for burners ± 1000mm
14.Loading door opening 610 *540mm
15.Hearth area  ±1.19square metres
16.Description of grate/hearth :A full hearth to be supplied to prevent contaminated
17.Liquids from flowing into ash pit without being incinerated
18.Compliance with South African Atmospheric Pollution Prevention Act No.45 of
1965 or equivalent air pollution standards
19.Documents to be supplied :Operations and maintenance manual and standard
operating procedures (SOPs)
20. Emission controls:
heated refractory screen
Low velocity grit settling chamber
Stainless steel arrester screen

21.Refractory material :alumina content> 49% and thickness average 102mm
22.Bake out : to be done over 2-3 days
23.Materials of constructions
Case :5mm mild steel
Bracing: heavy angle and channel
Hearth: 1550 ⁰C
Ashing door: high grade cast iron
Loading door 5mm mild steel lined with 1550 ⁰C castable general purpose high strength, high abrasion resistant monolithic refractory concrete.
Incinerator walls and roof: 1550 ⁰C castable monolithic refractory

an incinerator for food waste and polythene waste management

an incinerator for food waste and polythene waste management. as per our requirements we would like the YD 15C small incinerator.Mixed Biomedical waste Incinerator.Contract period:To be decided by the supplier
Payment terms:100% prepayment through bank TT after signing of contract.

Please confirm your willingness to execute this contract project by sending brochure and your price quotation for the below specification to enable us submit it to the firm incharge of the contract for their study and approval.

Type of Waste: Mixed Biomedical waste.THE INCINERATOR AS REQUESTED BY OUR CLIENT SHALL BE SEMI AUTOMATIC WITH:
WASTE BUCKET/TANK – ABOUT 2000KG
CAPACITY OF FEEDING: ABOUT 600-800Kg AT A TIME.
BURNING AT ABOUT 150/165-200 IN 60MINS
THE BURNER SHALL USE DIESEL/OIL
WITH CHIMNEY, ELECTRIC PANNELS,ELECTRIC MOTORS,ETC.
MATERIALS FOR DISPOSAL: SHARP MEDICAL WASTES.

1. Waste burning capacity of unit: 100-125 kgs / hr.
2. Mode of waste handling : Autoloading– DFDV + Bucket elevator
3. Type of fuel : LDO / HSD
4. Type of Burner operation : Automatic
5. Expected fuel consumption: 30-35 kgs/hr **(depending upon overall
mix of the waste, moisture
content, etc.) after preheat.
6. Connected electrical load : Approx. 7-8 KW (AC 3 phase,220V, 50 Hz).
7. Overall space requirement : 9 m (L) X 8 m (W) X 6 m (H) Each unit
without stack

Burners temperature controlled (TIC – Thermocouple) and work on ON –
OFF basis. The frequency on ON – OFF will depend upon the nature of
waste, moisture content, calorific value, etc. and shall vary from waste to
waste. The fuel consumption also depends upon the frequency of the door
opening and method of operation of the incinerator. We have mentioned
approx. expected fuel consumption figures.

The Incineration System comprises of :

I. Main Incinerator with
A. Primary & Secondary Chamber Modules duly refractory lined, piped & wired.
B. Bucket elevator + DFDV mechanism for autoloading and Deashing
mechanism
II i. 1 No. fully automatic Fuel Oil burner for primary chamber.
ii. 1 No. fully automatic Fuel Oil burner for secondary chamber.
III. Centrifugal forced draft fan assembly complete with motor drive, duct and
dampers, etc. mounted on the common skid of the unit to provide :
Combustion air.

Eductor air.
IV. Eductor Assembly for :
Cooling of exhaust gases from 900 – 1000 0 C to around 350 0 C .
Keeping the entire system under negative pressure to avoid hot gases / dust
particles rushing out of charging door.
V. Electrical Control Panel along with safeties, and Audio / Visual
indicators and
/ or alarms for efficient and safe operation of the system.
VI. Electrical wiring of the unit.
VII. Oil tank of 1000 ltrs capacity mounted on the skid
VIII. Operating tools and tackles comprising of – rake, hoe, shovel (I No. each).
IX. Chimney of  2.5 Mtr height.

HIGH TECH MEDICALWASTE INCINERATOR

Incinerator model A
Burn Rate 65kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
i.    The primary combustion chamber shall be accepted as the primary combustion zone;
ii.    The minimum combustion temperature of the primary chamber shall not be less than 800 degrees C;

Secondary combustion
The residence time in the secondary chamber shall not be less than 2 seconds;
The gas temperature as measured against the inside wall in the secondary chamber, not in the flame zone, shall not be less than as indicated in Lots 1-7 ;
Both the primary and the secondary temperatures shall be maintained until all the waste has been completely combusted;

Chimney
The chimney shall have a minimum height of 4 meters above ground level;
The minimum exit velocity of the emissions shall not be less than 10 metres/second;

Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature;

General
Control box can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height;

Lot 2
Item 5    Incinerator model B
Burn Rate 150kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Diesel/LPG/LNG, please indicate
Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 6    10m Hose Pipe, indicate length
Item 7    I000 Litre Fuel Tank + Pipe System, indicate volume
Item 8     Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 3
Item 9    Incinerator model C
Burn Rate 250kg/h minimum
Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 10    10m Hose Pipe, indicate length
Item 11    I000 Litre Fuel Tank + Pipe System, indicate volume
Item 12    Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 4 – High Temperature Waste Incinerator
Item 13    HTW Incinerator model D
Burn Rate – 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate
One year Spare Parts Package for complete maintainability
Item 14    10m Hose Pipe, indicate length
Item 15    1000 Litre Fuel Tank + Pipe System, indicate volume
Item 16    Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 5 – Mobile Incinerator
2.    Incinerator provides 2 chamber incineration and holds gasses for a minimum of 2 seconds.
3.    Each incinerator must have adequate labelling for parts/areas of high occupational health and safety risk on the incinerator.
4.    Evidence their product meets relevant national or international emissions standards, such as the United States Environmental Protection Agency, United Kingdom Department for Environment Food
& Rural Affairs, or European Union regulations and directives.

Item 17    Mobile Incinerator model E
Burn Rate 50kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 18    10m Hose Pipe, indicate length
Item 19    1000 Litre Fuel Tank + Pipe System, indicate volume
Item 20    Additional chimney extension, indicate height
Lot 6 – Mobile Incinerator
Item 21    Mobile Incinerator model F
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 22    10m Hose Pipe, indicate length
Item 23    1000 Litre Fuel Tank + Pipe System, indicate volume
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 1200 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume

incinerators

Specifications for Double Chamber Incinerator

INCINERATOR DESCRIPTION
The Model is for up to 300kgs capacity per batch load and will burn at around 55kgs per hour.
The unit has top loading design and has a heavy duty refractory cement lining for maximum heat retention. Unit have large top lid for easy loading, and specially designed front ash door, for ash removal.
This unit operates at over 1100°C in the primary chamber to ensure complete combustion. This model also benefits
from a heavy duty secondary chamber and burner which ensures a complete re-burn of any smoke and emissions and a 0.5 second gas retention time.
Burn rate    150kg/h minimum
Secondary Chamber    Yes
Gas Retention Time    2 seconds
Fuel    Diesel/LPG/LNG
Power Supply for Control Box    220V-240V 50Hz single phase
Minimum Operating Temperature    920˚C

PRIMARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
Large full size top load door and liquid retention sill
1 x diesel oil fired ignition burners operated on/off
SECONDARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
1 x diesel oil fired ignition burners operated on/off
Specifications for Double Chamber Incinerator:
Primary Combustion
The primary combustion chamber shall be accepted as the primary combustion zone.
The minimum combustion temperature of the primary chamber shall not be less than 800 degrees c
Secondary Combustion
The residence time in the secondary chamber shall not be less than 2 seconds
The gas temperature as measured against the inside wall in the secondary chamber ,not in the flame zone shall not be less than as indicated in Lot 1-7
Both the primary and secondary temperatures shall be maintained until all the waste has been completely combusted
Chimney
The chimney shall have a minimum height of 4 metres above ground level
The minimum exit velocity of the emissions shall not be less than 10metres/second
Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box can be detached and mounted on separate stand of atleast 1.5metres from the incinerator at approximately 1.6 metre height
CE compliant or equivalent for incinerators of this size and model
Drawings and photos for the offered lots
1 year spare parts,fuel tanks and 10metre hose to come standard with every incinerator
Specifications for Mobile Incinerator Units
Trailer mounted mobile incinerator units suitable for the following applications
Medical waste
Domestic waste
Industrial waste
Animal cadavers
CHIMNEY
Heavy-duty stainless steel casing
1.5m length
0.6m refractory lined stack
CONTROL PANEL
Control of 1 burner
Timer control 0- 12 hours
Integral fan timer control
Temperature Monitoring
Thermostatic Control
Automatic Control
Cycle time set up
ANCILLARIES
Operating and maintenance manuals
Spares list
CONTAINERISATION
incinerator fully installed inside of 10 ft ISO certified container
3,5 kwA electricity generator, 1000 litres fuel tank
Incinerator mounted on the silenblock cushion.

INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY,incinerator medical waste manufacturer

Diesel/LPG/LNG burning primary combustion chamber/primary combustion incinerator

Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter

heightItem 1
Incinerator model A

Burn Rate 65kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 850 °C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

I000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years

Item 2
Incinerator model B

Burn Rate 150kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Diesel/LPG/LNG, please indicate

Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Item 3
Incinerator model C
Burn Rate 250kg/h minimum

Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

High Temperature Waste Incinerator

Capacity at least (4000) kg/day ((Day=16 Working Hours))

Capacity at least (4000) kg/day ((Day=24 Working Hours))

With the following features:

*Automatic feeder as original part of the unit.

*Automatic ash / leftovers removal as original part of the unit.

*Water Injection System to control the temperature>

*Flue gas filtration system complying with EU.

*Continuous emission monitoring and recording system.

*It should include installation, testing, and staff training.

*6 nos. of heavy duty loading containers.

Item 4
HTW Incinerator model D
Burn Rate – 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Mobile Incinerator

Item 5
Mobile Incinerator model E

Burn Rate 50kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 850 °C, please indicate

One year Spare Parts Package for complete maintainability
Mobile Incinerator

Item 6
Mobile Incinerator model F

Burn Rate 100kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 850 °C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

1000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years
High Temperature Waste Mobile Incinerator
Item 7
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 1200 °C, please indicate
Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter

height
Warranty, indicate no of years

Containerized diesel fueled incinerators

Incinerator Type: Containerized, diesel fueled
Burning Rate:100–120kg/hour
Minimum Operating Temperature:850o C(primary combustion)
Maximum Operating Temperature:1450 oC(Afterburner chamber)
Secondary Burning Capacity:Compulsory
Density Insulation:20mm High
Refractory Casting:Minimum 65mm
Heavy duty refracting lining to withstand:1500 oC
Average burn out time :maximum:3 hrs
Fuel type:Diesel
Fuel Consumption in L/hr:7.5 to 9
Residence time in secondary chamber:2sec
Residue ash pot 100kg:Max 3.8kg
Incinerator type: Animal waste incinerator
Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m

INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY,incinerator medical waste manufacturer

Gasified incineration for burning medical wastes incinerator

Gasified incineration for burning medical wastes.

Fuel type: Natural Gas
Burning Capability:
–     30-50 kg/time
–     Daily 3-6 times

Incinerator size:  max 2000x1200x3200 mm
Burning room volume:
–     Gasification room max 0.7 m3,
–     Secondary burning room max 0.5 m3,

Size of the filling entrance: max 650×850 mm
Air blower: max 0,5 kW
Combustion-support combustion machines:
–     Power max 0,2 kW
INCINERATOR (WASTE INCINERATOR)
Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated “red bag.” Surgical dressings, plastic test devices and other wastes
Fast, complete, efficient waste disposal
Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption.
Minimum installation and start up time
Aluminized steel jacket lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available.
Charging system:
•    Vertical charge door on primary chamber.
•    Pneumatic or hydraulic ram charging system.
•    Auto shut down of the door after charging.
•    Primary and secondary chamber temperature displayed and recorded (optional)
Charging rate:
•    Up to 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
Fuel:-     Natural Gas
Capacity (Cubic Mtr):    1.65M3 or more
Ave Capacity:    100kg per hour
Secondary Chamber Capacity (CubicMtr) :3.88 or more
Length (mm):    1880 or better
Width (mm):    1280 or better
Height Incl. Flue (mm):    7700 or better
Ash  Door Opening (mm):    475×900 or better
Min. Operating temperature:    90 degree centigrade
Max, Operating Temperature:    1350 degree centigrade
Residency time in Second Chamber:    2 sec
Temperature Monitoring: Both for primary and secondary chambers.
Loading SystemManual/semi-automatic
Waste destruction efficiency:> 90% by weight
Filter: Ceramic or other equivalent filters in order to reduce the induction of hazardous air pollutants, particulates, co,dioxin/furane into the atmosphere.
De ashing system: Manual/semi-automatic.
The System must be quoted complete with:-
•    Plumbing
•    Electrical panels
•    Civil works
•    Waste collection Trolleys
Re-burning machine: Power max 0,2 kW Voltage: 220V / 380V
Weight: max 5000 kg

Two combustion chambers type incinerator

Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof
and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules
in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m.Medical and Biological wastage.
3.1              Main unit
3.1.1
Application      For incineration, general and pathological
3.1.2                                            Capacity       100 – 120 kg/h burn rate
3.1.3
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4         Operating time                   Minimum 8 hours daily
3.1.5          Operating temperature        From 850 0C to 1200 0C, Automatic controlled
3.1.6          Residual Ash                       5 to 10%
3.2     Primary Chamber
3.2.1
Construction    Constructed from heavy duty mild or aluminized  steel
Or equal and approved equivalent
3.2.2
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
3.2.3
Internal Construction           Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material
3.2.4
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
3.2.5          Door Lock                             Automatic, Electric type
3.2.6
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
3.2.7                                    Gratings       Provided
3.2.8                                            Loading    Manual loading of waste
3.2.9           Primary Burner                           Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type
Flange mounted
3.2.10    Blower      Provided.  3 phase for supplying excess combustion air through the distribution system with speed control system
3.2.11    Temperature    Minimum exit 850 0C
3.2.12                               Observation port    To be provided with protective glass type
3.3    Secondary chamber
3.3.1
Construction    Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2                                            Insulation    Refractory material lining
3.3.3             Combustion Temperatures      Above 850 0C, controlled electronically
3.3.4             Gas residue or retention time                                              > 2 second at minimum 850 0C
3.3.5    Secondary Burner    Provided,
Diesel fired,
Fully automatic, with fuel, temperature and speed controls
With ignition system
Flame detector
Air fan
Complete with safety features, flame failure
Diesel fired fuel injector type
Flange mounted
3.3.6    Ejector    Provided, Venturi type, for cooling the flue gases
3.3.7
Combustion Air Fan                      Provided for supplying combustion and creating a
negative drift and turbulences with variable speed control
3.3.8                                         Temperature    Maximum  1600 0C
3.4       Chimney
3.4.1
Construction    Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent
Refractory material lining
3.4.2                                                    Length    10 m above ground
3.4.3                                                        Bore    about 350mm diameter
3.4.4            Discharge temperatures             About 850 0C
3.4.5                                            Emissions    To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
3.5.1    Control unit                                           Fully automatic with microprocessor based control
unit (PLC) automating all operations of the incinerator
Capable of monitoring all incinerator parameters
With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and second chambers , turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
3.5.2    Isolator switch                                  Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m
3.5.3
Distribution Board           Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
3.5.4
Wiring       Make provisions for wiring the isolator switch,
Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.
Working length 20m.
Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6    Fuel System
3.6.1          Fuel Tank                                            Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Tank capacity, 500 liters, constructed from preferable
suitable metallic material or high temperature
resistance material
Fuel type    Diesel
3.6.2
Fuel Lines                                       Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.  Working length , 20m
Fuel pipe material    Special copper pipes or similar and approved materials
4. Physical characteristics
4.1              Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions    About 2.5 x 2.8m (WxD)
5.  Operating environment
5.1              Power Requirements                      415V, A/C 50Hz, Three phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6             Accessories
6.1             Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
7. Spare parts
7.1                                                      Burner        1 set
7.2              Fuel Filters                                         6 sets
7.3
All other spare parts                 required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
8.2
Manufacturing standards               Environmental Management and Coordination Act, 1999
Legal Notice No.121 of 29th September 1999 on                                                                         waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
9.1                                                         Available    Should be available locally
9.2           Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
10.1                                                        KEMSA    For inspection and verification
10.2
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
11    Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12    Installation and testing    Complete installation and setup of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
13            Training
13.1
User training                                           On site user training on operation and daily up keep
13.2
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14    Technical Documentations
14.1         User manuals                                          2 sets
14.2         Service manuals                                     2 sets
14.3                                                     Drawings    2 sets
15        Commissioning
15.1    Testing and Commissioning of the machine to the satisfaction of the user
16    Warranty
16.1                                                  Equipment      Minimum of one year after commissioning on all parts.
16.2       Equipment system                                     Nil
17.    Maintenance contract
17.2         Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

Capacity per day around 8-10 kg wastage/day.·         Which product do you offer, only incinerator or also compactor, shredder machine, any other equipment related to waste treatment ?

·         For the incinerator, can you propose (and of so please send us specs and price) incinerator for 25 kg/hr, 50 Kg / hr, 100 kg / hr, 200 kg / hr ? what is your minimum and maximum size available ?

·         As we are not so experience in incineration process, can you tell us which type of waste can go into the incinerator and still respecting international environmental regulation ?

·         Do you equipped your incinerator with filters ? if so which one and they are following which standard ?

·         Can you supply exhaust pipe from incinerator to the roof, and then whirly bird to avoid the rain water to go into the pipe ?

·         When we install an incinerator within a building, what are the distance to observe between equipment and wall and roof (as we need to supply also the building to house the incinerator )