Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
mobile incinerator
- Petrol: diesel
- Consumption: 8-10liter/hour
- Capacity: to cremate (carrion and spoils) 350-400kg/hour
- Temperature: 900-1350?C
- Operation temperature: -30~40?C
- Incinerator weight: 1800-2000 kg
- Volume: 0.70-0.80m/cube
- Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)
An incinerator represents a complete solution to the problem of disposal of all hospital waste types. The liquid fuel
is diesel. The incinerator should meet the environment standards. Expected Technical specifications
The incinerator shall be fully self contained. incinerators that are stainless
steel with destruction rate of 15kg per hr. bactch load of 10-15kg of
waste and average temperature of 8500 degress c.
hospital incinerator
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22. Process Filtering system : Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or équivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perforn an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from
the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
NB.: Civil works and any other related services for the installation and training of operators must be included in the incinerator’s price.
Specification for the shelter of the incinerator: House of the incinerator inclusive in offer (the house must have facilities for hand washing and firefighting).
This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incinerator; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; 2 metal doors ;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); measures for this specification will depend on the size of the incinerator which will determine the size of the shed of the incinerator., etc
medical incinerators
* medical incinerators, The insulation of the combustion chamber should be composed of refractory bricks, having a
high content of aluminium and insulates bricks in order to assure a minimum temperature on
the outside sheet metal.
* Composition of the refractory;
? Refractory concrete :
? . Thickness : ≥100 mm
? . Nature: 42% of Al203
? Insulate in fibrous panels :
? . Thickness: ≥75 mm
? Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
? Refractory concrete :
? Thickness : ≥150 mm
? Nature: 65% of Al203
? Insulate in fibrous panel :
? Thickness: ≥85 mm
? Nature: Calcium
pet incinerator for sale
1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
4. Design Specification : Types A, B, C, D, and E of medical waste
5. “PYROLYTIC” combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, during the loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
? The Temperatures of combustion: Minimum will be 850oC and max 1400oC
? Post combustion: >1100oC.
11. The Internal diameter of the Chimney: ? 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70×70.
14. Burner operation should be Automatic On/Off
15. Fuel : diesel
16. The supplier must provide necessary information for the best of the installation
This incinerator with “PYROLYTIC” combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
hospital incinerator design
INCINERATEUR DE DECHETS HOSPITALIER hospital incinerator design
SPECIFICATIONS TECHNIQUES.
Capacité destructive de 55 Kg/h jour de déchets hospitaliers avec un p?.c. i jusqu’à 3.200 Kcal/Kg
1)Type de déchet
hospitalier
2)Pouvoir calorifique inférieur 3.200 kcal/kg
3)Humidité 20%
4)Teneur en cendres et/ou inertes 8%
5)Capacité destructive nominale 55 kg/h
6)Volume chambre de combustion 1,65 m3
7)Volume chambre postcombustion 2.1 m3
8)Temps transit des fumées en post combustion /sec. <2
9)Température minimale en postcombustion 1.100° C
10)Teneur d’oxygène libre en postcombustion 6%
11)Attribution refuse confectionné en sachets HDPE
12)Dispositif de chargement?: hydraulique?; capacité de charge 0.5 m3
13)Combustible prévu Gasoil
14)Br?leur en chambre de combustion nbr?: 1
15)Br?leur en chambre de postcombustion nbr?: 2
CONSTITTUTION DE L’APPAREIL.
1.CHARGEMENT
Système de chargement hydraulique afin de pouvoir charger le four en toute sécurité même durant son fonctionnement et
aussi assurer la puissance destructive globale de 450 kg/j?
Le système comprend?:
1-1Trémie de chargement de forme parallélépipédique de 0,5 m3 de volume, réalisée en t?le d’acier, bridés sur la paroi
frontale de la chambre de combustion et munie d’un couvercle à charnières actionné par vérin hydraulique?.
Dimensions?:
oLongueur 1200 mm
oHauteur 700 mm
oLargeur 600
1-2Un poussoir hydraulique assurera le chargement de la chambre de combustion
1-3 Une porte de chargement de la chambre de combustion constituée d’une guillotine à vérin hydraulique revêtue
de réfractaire
1-4Un central hydraulique pour piloter tous les vérins de commande, comprenant?: réservoir, pompe, électrovannes et
tuyauteries
2.CHAMBRE DE COMBUSTION PRIMAIRE
2-1- Le bati est une structure métallique cylindrique revêtue intérieurement d’une couche d’isolant et d’une
couche de réfractaire.
2-2-Volume intérieur?: 1,65 m3
2-3-Aménagement
?portillon de décharge des cendres?: frontal?; monté sur double charnière et revêtu de réfractaire avec hublot
d’inspection
?La connexion à la chambre de chargement est revêtue de réfractaire
?La connexion de la chambre de combustion et de la chambre de post combustion est revêtue de réfractaire
?Installation des bruleurs
?Installation du système de distribution de l’air comburant
?Installation des sondes de mesure de la température
?Le bac de récolte des cendres est en acier au carbone sur roulettes, équipé de racloir métallique permettant
l’évacuation manuelle des cendres
3. BRULEUR DE LA CHAMBRE DE COMBUSQTION
Un bruleur de type à une flamme à l’air soufflé, alimenté par gasoil, équipé des dispositifs de sécurité Puissance
thermique installée 165 KW.
4. AIR COMBURANT
Le système de distribution et dosage de l’air primaire en chambre de combustion comprend?:
?Ventilateur centrifuge
?Canalisations de distribution air
?Systéme de distribution d’air à 2 canaux
?Soupape de régulation de l’air motorisé selon les phases de cycle de fonctionnement et de la température
5. CHAMBRE DE POST COMBUSTION
5-1- Chambre de post combustion est installée au dessus du foyer de combustion , elle est constituée d’un
cylindre métallique revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires.
5-2- Volume intérieur?: 2,1 m3
Est dimensionnée pour pouvoir garantir un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène libre
d’au moins 6 %.
5-3 -Accessoires
?Trappe de visite boulonnée frontal pour permettre l’inspection périodique
?La liaison à la chambre de combustion est tapissée de réfractaire
?Installation les br?leurs
?Installation des sondes de mesure température
6. PRODUCTION DE L’AIR COMBURANT DE LA CHAMBRE DE POST COMBUSTION
?Ventilateur centrifuge
?Tuyauteries de distribution d’air
?Série de vannes de distribution d’air
?Soupape de régulation de l’air soufflé asservi par la sonde du débit d’ oxygène
7. BRULEUR DE LA CHAMBRE DE POST COMBUSTION
Sont prévus 2 br?leurs du type à l’air soufflé au gasoil équipés des dispositifs de sécurité.
A la mise en route du four les deux br?leurs sont allumés pour assurer la température minimale d’au moins 1100°C?;
ils restent en marche successivement pour maintenir la température constante.
Puissance thermique installée (290 + 350) KW.
8. CHEMINEE D’EVACUATION
Constitué par un conduit métallique vertical de 8 m de long installée au-dessus de la chambre de PC, diamètre 630 mm
en t?le d’acier au carbone avec garnissage intérieur en réfractaire
9. ARMOIRE ELECTRIQUE DE COMMANDE ET REGULATION
Composée de?:
?Circuit 380 V- 50 HZ-3 phases
?Voyant sous tension
?Commande d’arrêt général
?Voyant état des bruleurs
?Affichage des températures des deux chambres
?Minuterie des temps des cycles.
?Une variation des vitesses des ventilateurs
?Le tableau et les cablages sont prévus aux règles CEI avec protection IP 55
?Microprocesseur pour le contr?le et la régulation des températures, ainsi que les cycles d’opération
?Cablages réalisés selon les règles CEI.
10. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU
Les dispositifs suivants sont prévus?:
1)Thermocouples pour la mesure de la température en chambre de combustion? et postcombustion, à la sortie de
l’échangeur dans la section d’entrée du filtre
2)Système de mesure de la concentration d’oxygène dans les fumées humides a la sortie de la chambre de postcombustion
constitué de?:
?Sonde de mesure de l’oxygène à l’oxyde de zirconium
?Pompe à la membrane
?débitmètre